The London-listed company says it has revised the drilling design following an independent technical report. The equipment inventory must be finalized in early August 2026, while environmental authorization is expected in July for a planned depth of around 950 meters. The post Gas: Predator Oil & Gas accelerates preparations for the MOU-6 well in Morocco appeared first on Médias24 - Number one in Moroccan economic information.