The task was assigned to the semi-functional hospital "on top of the hill" in Durood
⚡ Quick Summary
The head of the Durood Health and Treatment Network announced the assignment of the half-completed project of the 160-bed hospital called "Balai Tepe" and said: "This complex will be converted into a nursing school and a student dormitory after the change of use."