Progress of VLT works causes new blockages and detours on BR-324
⚡ Quick Summary
Progress of VLT works causes new blockages and detours on BR-324 Disclosure The progress of construction work on the Light Rail Vehicle (VLT) will cause new blockages and detours on BR-324, near the Águas Claras neighborhood, in Salvador.
Progress of VLT works causes new blockages and detours on BR-324
Disclosure
The progress of construction work on the Light Rail Vehicle (VLT) will cause new blockages and detours on BR-324, near the Águas Claras neighborhood, in Salvador.
The information was released by the Bahia State Transport Company (CTB) this Tuesday (9). The changes will take place between Thursday (11) and Saturday (13), from 10pm to 4am.
According to the agency, during this period the bracing of the beams will be completed and the concrete pre-slabs will be installed — structures necessary for the formation of the elevated road where the new mode will circulate.
In a note, the CTB advises the population to plan their trips in advance and reinforces that the interventions are fundamental for the advancement of the VLT works, a strategic project for urban mobility in Salvador and RMS.
To assist drivers and residents of the region, illustrative images were made available with guidance on planned detours and interventions, facilitating the visualization of road changes that will occur during the execution of services.
📲 Click here and join the g1 Bahia WhatsApp group
READ MORE:
BRT from Lapa to the airport, subway in Campo Grande and VLT that connects to Simões Filho: what the future of public transport will be like in Salvador
Government of BA announces temporary vacancies to work in the assisted operation of the VLT in Salvador and the metropolitan region
First VLT test trip is carried out in Salvador four years after the trains were deactivated
See more state news on g1 Bahia.
Watch videos from g1 and TV Bahia 💻
← Back